Greenlane, a joint-venture between Daimler Truck North America, NextEra Energy Resources and Blackrock has announced a 280 mile commercial vehicle charging corridor with 100 chargers linking Los Angeles with Las Vegas.

Greenlane_Nevada_Corridor

Greenlane Charging Corridor

The new charging corridor along Interstate 15 aims to accelerate the roll-out of carbon-neutral freight transportation with initial charging locations in Colton, Barstow and Baker, California. Over the next year, further locations will be added along the corridor, extending beyond Southern Nevada and to San Pedro in California. 

“After considering various factors, such as truck telematics data, frequent freight routes and customer deployment strategy, the Greenlane team selected these three optimal locations for our first commercial charging corridor to accelerate the transition to zero emissions,” said Patrick Macdonald-King, CEO of Greenlane. “The launch of this corridor not only marks a critical step in addressing the urgent need for publicly available, nationwide electric charging for commercial vehicles but will also serve as a model for the EV charging hubs of the future.” 

At full build the Colton site is planned to have over 60 chargers, including 400kW Direct Current Fast Chargers (DCFC) to speed charging of medium- and heavy-duty zero-emission vehicles. More 200kW DCFC charging options onsite will enable long-duration and overnight charging for heavy-duty tractors, medium-duty ZEVs and school buses. Later project phases will support both long-duration and overnight charging lanes for tractor-trailer combinations. The Greenlane site in Colton will also be future-proofed to accommodate the Megawatt Charging System (MCS) when commercially available. 

“By using a predictive modeling tool to simulate truck traffic and energy flow at the site, we can determine how many chargers are necessary to meet the regional demand based on vehicle characteristics and departure and arrival times for vehicles hauling freight along this corridor,” said Macdonald-King. “Our findings indicated that placing the three stations approximately 60 to 90 miles apart would maximise uptime for day-cab drivers by enabling shorter charging sessions at each stop and ultimately allowing customers to move freight confidently without any limitations.”    

Designed to upgrade and enhance the current rest stop experience, each Greenlane site will have wide pull-through lanes, allowing drivers to enter and exit the property quickly and easily. While waiting for vehicles to charge, drivers can access modern facilities, with restrooms and other amenities, including food and beverage options. Greenlane aims to develop a nationwide network of commercial charging infrastructure locations across the US.

Greenlane is targeting a spring groundbreaking on the Colton flagship site, aiming to open in late 2024.